Kincumber Rising Main
The client required a new 500mm rising main be installed using Horizontal Directional Drilling through mountainous terrain made up of a rock formation mainly of sandstone. Previous construction attempts failed to produce a completed pilot bore with boring undertaken from both ends.
Numerous reasons for this were investigated and conclusions made with equipment selection being one of the main issues for failure. Trenchless Advisor was contracted to assess the failed project and find suitable and practical solutions.
Gosford City Council
Service:
Assessed failed project, implement practical solutions and design, compile a more suitable tender specification
Industry:
Sewer
Product:
DN400PE100PN16
Bore Length:
220m
Environmental Factors:
Drilling through a mountain
Ground Conditions:
Sandstone